Skip to content

Engineering practice

What is the difference between verification and validation?

LAST REVIEWED

VerificationValidation
QuestionDid we build it right?Did we build the right thing?
ReferenceThe specified requirementsThe intended use and operating context
Typical activityReview, analysis, unit and integration test against requirementsField, vehicle or operational trials, user and scenario testing
Typical evidenceTraceable test results per requirement, coverage reportsScenario results, operational acceptance, residual-risk judgement

The practical failure mode is a programme with excellent verification and no validation: every requirement is closed, and the requirement set itself was never checked against the hazard analysis or the way the product is actually used. Traceability from hazards to requirements is what makes that gap visible.

Want this answered for your product?

The scope checker gives you a documented read in a few minutes, including a full PDF.